DESCRIPTION OF WATER PROJECTS

PROJECT NAME PROJECT DESCRIPTION OWNER

Dixie Water Association
Hydraulic Analysis
 

Hydraulic analysis of the Dixie Water Association system to model the existing domestic water flows. Dixie Water Association

City of Petal
Hydraulic Analysis
 

Hydraulic analysis of the City of Petal water system including domestic water flows, fire flows, and water quality analysis. City of Petal

Glendale Utility District
Highway 42 Water Relocations

Relocation of the water and sewer lines along 3 miles of the new alignment of Highway 42 in Glendale just north of Hattiesburg, Mississippi. Glendale Utility District
Hattiesburg, MS

North Lamar Water Association
New 500,000 gal. Water Tank

Design of the tank including hydraulically analyzing the effects of the new tank on the existing North Lamar water system, and inspection of the construction. North Lamar Water Association 4906 Old Hwy 11 - #8
Hattiesburg, MS 39402
City of Collins
300,000 Gallon Elevated Tank
Design and Inspection City of Collins
P. O. Box 400
Collins, MS 39428
601-765-4492

Hattiesburg Industrial Park
Elevated Tank, Water & Sewer Systems

Design and Inspection City of Hattiesburg P.O. Box 1898
Hattiesburg, MS 39403
601-545-4640

North Lamar Water Association
4 Wells, 2 Elevated Tanks and Water & Sewer Systems

Design and Inspection North Lamar Water Association 4906 Old Hwy 11 - #8
Hattiesburg, MS 39402

Dixie Community Utility Assoc.
3 Wells, 3 Elevated Tanks and Water Distribution System

Design and Inspection Dixie Community Utility Association
930 Bonhomie Road
Hattiesburg, MS 39401
601-582-5038

Barrontown Utility Association
3 Wells, 3 Elevated Tanks and Water Distribution System

Design and Inspection Barrontown Utility Association
101 Dogwood Lane
Petal, MS 39465
601-544-3535

Runnelstown Utility District
2 Wells, 2 Tanks and Water Distribution System

Design and Inspection Runnelstown Utility District
39 Corinth Church Road
Petal, MS 39465
601-582-9873

City of Collins Water
Improvements to include hydraulic analysis, elevated tank, domestic flows, and line sizing along with fire flows and line sizing.

Performance and evaluation of hydraulic analysis and pressures of line sizes. To evaluate quality of flows throughout the system. Coordination with the Mississippi State Department of Health to insure Minimum Design Standards were met. Address existing supply and potential for expansion. Hydraulic Analysis, additionally, addressed fire demand in accordance with Mississippi State Rating Bureau. A cost analysis was performed of all options.

City of Collins

P. O. Box 400
Collins, MS 39428
601-765-4492

City of Lumberton
Water Improvements to include hydraulic analysis, elevated tank, domestic flows, and line sizing along with fire flows and line sizing.
Performance and evaluation of hydraulic analysis and pressures of line sizes. To evaluate quality of flows throughout the system. Coordination with the Mississippi State Department of Health to insure Minimum Design Standards were met. Address existing supply and potential for expansion. Hydraulic Analysis, additionally, addressed fire demand in accordance with Mississippi State Rating Bureau. A cost analysis was performed of all items. City of Lumberton
P. O. Box 211
Lumberton, MS 39455
601-796-7000
tank_th.jpg - 3kb

Pearl River Community College

Water Improvements including an elevated tank, pumping station and line sizing along with fire flows and domestic flows.

Performance and evaluation of hydraulic analysis and pressures of line sizes. To evaluate quality of flows throughout the system. Coordination with the Mississippi State Department of Health to insure Minimum Design Standards were met. Address existing supply and potential for expansion. Hydraulic Analysis, additionally, addressed fire demand in accordance with Mississippi State Rating Bureau. A cost analysis was performed of all items.

Pearl River Community College

Station A, Box 5090
Poplarville, MS 39470
601-795-6801

North Lumberton Utility Association
Water Improvements to include an elevated tank, water well and domestic lines

Performance and evaluation of Hydraulic Analysis, investigation of existing storage and introduction of new elevated tank, investigation of existing supply and introduction of new well, introduction of new domestic lines. North Lumberton Utility Association
211 Main Street
Lumberton, MS 39455
601-796-4941
Hattiesburg Convention/Conference Center
Phase I and Phase II Environmental Assessment including wetlands survey
Perform Phase I and Phase II assessments to determine any contamination of soil or ground water. Of particular concern was for formaldehyde leaking from an adjacent cemetery. Oversee the investigation of a wetlands survey. Hattiesburg Convention/Conference Center
P. O. Box 1898
Hattiesburg, MS 39403
(601) 545-4640